HEALTHCARE
Eye Surgeons Associates, PCBettendorf, Iowa This was a fast-track 19,000 square foot building, which was completed in phases that allowed construction to start while the design team, consisting of Holland Basham Architects, Tri-City Electric, Northwest Mechanical and Paragon Interiors, developed the design. Design and construction overlapped for a total schedule of eight months. Estes successfully performed all the building concrete work, rough and finish carpentry, doors and casework installation. One look at the building is proof that working with the team in the earliest stages of construction produces the best results for the best value.
"Eric ensured that every detail was done to the architect's specifications; he took the responsibility to ensure that the design, fit, and finish met our needs and standards for quality. Eric pointed out designs that didn't quite work and suggested alternates before we got to the point that change orders and additional expenses would have resulted."
Dan Craig, Executive Director Eye Surgeons Associates, P.C.
Next Project » |
Healthcare Projects 1
:.
2
:.
3
:.
4
:.
5
:.
6
|