INDUSTRIAL
Vegter Steel Fabrication PlantMorrison, Illinois The 24,000 square foot facility was designed and constructed in six months near Morrison Industrial Park on a 38 acre site. The Morrison facility will be used for the fully automated fabrication of structural steel, plasma cutting of steel sheeting and assembly of related components. This is the only type of automated plant in this area.
"I selected Estes Construction for the construction of Vegter Steel Fabrication Plant because of my comfort level with the company and how they do business. Wespecialize in pipe fabrication and installation, structural steel fabrication and erection, and equipment setting and have worked as a subcontractor on a number of Estes projects. Estes was highly involved in the pre-planning and design phase of this project, which allowed us to set clear expectations for everyone involved, and thisyielded a positive outcome. I would definitely select Estes again in the future."
Mike Vegter, President Vegter Steel Fabrication Plant
Next Project » |
Industrial Projects 1
:.
2
:.
3
:.
4
:.
5
|